This (slide 6) is a blowup of a plan from, like, a 1940s or ‘50s German office building....
Search Results "Floor Plan"
-
Furniture in Space with Clutter
-
Surprise Drills
The emergency plan should include conducting surprise drills two or three times a year, at different times of the day and different shifts....
-
7.2.2 General Exception 2
For long-distance trails, this exception applies to the trail segments that are planned for construction or alteration in a given planning period, rather than over the entire length of the...
-
Exits
This is required to the extent possible under the intended number of entrances; this provision does not require an increase in the total number of entrances planned for a facility....
-
Signal Type: ADA Standard Section 407.4.8.2.1
Section 407.4.8.2.1 covers the current ADA Standards for the signal type of audible elevator car indicators.
-
11B-809.10.6.4 Reinforcement for grab bars
grabs bars shall comply with the following: Continuous reinforcement shall be installed in the walls of showers 30 inches (762 mm) maximum to 38 inches (965 mm) minimum above the finish floor...
-
11B-809.10.6.4 Reinforcement for grab bars
grabs bars shall comply with the following: Continuous reinforcement shall be installed in the walls of showers 30 inches (762 mm) maximum to 38 inches (965 mm) minimum above the finish floor...
-
4.1.3(5)*
For example, floors above or below the accessible ground floor must meet the requirements of this section except for elevator service....
-
11B-703.5.5 Character height
Exception: Where provided, floor plans providing emergency procedures information in accordance with Title 19 shall not be required to comply with Section 11B-703.5.5....
-
11B-703.5.5 Character height
Exception: Where provided, floor plans providing emergency procedures information in accordance with Title 19 shall not be required to comply with Section 11B-703.5.5....
-
11B-703.5.5 Character height
Exception: Where provided, floor plans providing emergency procedures information in accordance with Title 19 shall not be required to comply with Section 11B-703.5.5....
-
§ 37.145(d)(2)
(2) Does the plan appear reasonable?...
-
ADA Team
First, the self-evaluation and transition plan require collecting information from all programs, services, and activities of the entity. This is too large a task for one person....
-
68.70. Registered Accessibility Specialists--Qualifications for Certification
2005, 30 TexReg 382; amended effective March 1, 2007, 32 TexReg 884) (a) An applicant seeking departmental certification as a registered accessibility specialist in order to perform plan...
-
68.30(2) Places Used Primarily for Religious Rituals
To facilitate the plan review, the owner or occupant shall include a clear designation of such areas with the plans submitted for review....
-
Research Projects
A number of research projects have been completed by the Access Board and others are underway or planned....
-
Research Projects
A number of research projects have been completed by the Access Board and others are underway or planned....
- Bradley Advocate AV-Series Model AV30 Lavatory, Soap & Hand Dryer Informational Video
-
Will a Person Who is Blind or Has Low Vision Require Assistance to Use the Circulation Path?
If he or she cannot, then that person’s personal emergency evacuation plan will include a method for providing appropriate assistance....
-
3. FIELD VERIFICATION
FIELD VERIFICATION: DSA may review the code compliance of the path of travel during the course of a project. 3.1 Plan Review: DSA may verify compliance of path of travel elements presented...
-
16(f)
the ADA Consultant, each hotel owner shall be required to either (i) certify that its hotel complies with all of the conditions set forth in subparagraph 16(a) above; or (ii) submit a plan...
-
11B-306.3.1 General
Space under an element between 9 inches (229 mm) and 27 inches (686 mm) above the finish floor or ground shall be considered knee clearance and shall comply with Section 11B-306.3....
-
11B-306.3.1 General
Space under an element between 9 inches (229 mm) and 27 inches (686 mm) above the finish floor or ground shall be considered knee clearance and shall comply with Section 11B-306.3....
-
11B-201.4 Construction Support Facilities
permanent construction support facilities for uses and activities not directly associated with the actual processes of construction, including but not limited to offices, meeting rooms, plan...