For the purpose of this code, off-road, self-propelled electric vehicles, such as industrial trucks, hoists, lifts, transports, golf carts, airline ground support equipment, tractors, boats...
Search Results "Building Code"
-
ELECTRIC VEHICLE (EV)
-
1010.1.9.1 Hardware
and M occupancies with an occupant load of 10 or less, shall comply with SFM Standard 12-10-2, Section 12-10-202 contained in the CCR, Title 24, Part 12, California Referenced Standards Code...
- Door King Inc. 1515 Surface Mount Entry Keypad
-
11B-202.1 General
Additions and alterations to existing buildings or facilities shall comply with Section 11B-202. ...
-
ELEMENT
[DSA-AC] An architectural or mechanical component of a building, facility, space or site....
-
Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
[A] REPAIR
The reconstruction or renewal of any part of an existing building for the purpose of its maintenance....
-
F202.2 Additions
Each addition to an existing building or facility shall comply with the requirements for new construction....
-
4.2 Q. What if new public and common use spaces are also being added?
If new public and common use areas or buildings are also added, they are required to be accessible....
-
202.1 General
Additions and alterations to existing buildings or facilities shall comply with 202....
-
Construction
Construction is building a new trail, recreation site, or facility where there was none before....
-
68.30(1) Federal Property
Buildings or facilities owned, operated, or leased by the federal government;...
-
11B-202.1 General
Additions and alterations to existing buildings or facilities shall comply with Section 11B-202....
-
11B-202.1 General
Additions and alterations to existing buildings or facilities shall comply with Section 11B-202....
- Allegion Falcon 1790 Series Exit Devices
- Atlantis Railing
-
§ 36.406(a)(1)
(1) New construction and alterations subject to §§ 36.401 or 36.402 shall comply with the 1991 Standards if the date when the last application for a building permit or permit extension is...
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
§ 36.406(a)(3)
(3) New construction and alterations subject to §§ 36.401 or 36.402 shall comply with the 2010 Standards if the date when the last application for a building permit or permit extension is...
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
- Viking Talk-A-Phones ETP-400V and ETP-400DV, Panel Phone E-1600A-TP-EWP
-
907.2.9 Group R-2
the lowest level of exit discharge; Any dwelling unit is located more than one story below the highest level of exit discharge of exits serving the dwelling unit; or The building...
-
TTY Scoping [4.1.3(17)(c)]
TTY Scoping [4.1.3(17)(c)] ADAAG requires at least one TTY on site when there are four or more pay phones (and at least one is interior) and in specific buildings or locations when a...
-
3.5.1 General
If the main entrance to a building is not accessible, in the vicinity of the closest accessible entrance. Accessible means of egress out of a building....