accessible route diverges from the route for the general public and should be located at decision points (for example where the path to the stairs diverges from the path to an elevator or ramp...
Search Results "Curved Curb Ramp"
Commonly Searched Documents
-
11B-216.6 Entrances
-
Tiles
The playground owner attributed the construction error to the learning curve involved with installation of the new surface and reported each new site was improved based on the experience...
-
Accessible Play Components
Accessible play components are required to be on accessible routes, including elevated play components that are required to be connected by ramps....
-
Clear Floor Space: Minimum Clear Floor Space Required - Manual, Power & Scooter
The clear floor area width dimension also informs the minimum clearance width for successful passage through corridors, doorways, and wheelchair ramps....
-
209 Passenger Loading Zones
In bus loading zones restricted to use by designated or specified public transportation vehicles, each bus bay, bus stop, or other area designated for lift or ramp deployment shall comply...
-
1009.1 Accessible means of egress required
In assembly areas with ramped aisles or stepped aisles, one accessible means of egress is permitted where the common path of egress travel is accessible and meets the requirements in Section...
-
§ 38.77(c)
(c) At all doors on level-entry vehicles, and at each entrance accessible by lift, ramp, bridge plate or other suitable means, handrails, stanchions, passenger seats, vehicle driver seat...
-
3. Swimming Pools
At Balboa Pool, Kirola encountered a steep entrance ramp and an inadequate locker room. RT 1388:5-6....
-
4.5 Weight Scales
Current scales with some accessible features come in various configurations, including wheelchair weight scales with single ramps, dual ramps, stand-on scales, and wall mounted scales with...
-
Conflict with Local Accessibility Codes
The commenter stated that the State of Washington's accessibility code may require installation of a ramp, and that the ramp may then create an accessible entrance for the ground floor,...
-
[2010 ADAS] 105.2.2 ASME
standard includes additional provisions for runway enclosures, electrical equipment and wiring, structural support, headroom clearance (which is 80 inches minimum), lower level access ramps...
-
[2010 ADAS] 105.2.2 ASME
standard includes additional provisions for runway enclosures, electrical equipment and wiring, structural support, headroom clearance (which is 80 inches minimum), lower level access ramps...
- STI Stopper® Emergency Station, Push, Turn-to-Reset SS-2001E Fire Alarm
-
11B-101.1 General
Chapter 11B accessibility regulations are applicable to: 1) publicly funded buildings, structures, sidewalks, curbs and related facilities; 2) privately funded public accommodations and...
- Adaptive Access
- Placer Independent Resource Services - Auburn, CA
-
240.2.2 Elevated Play Components
For purposes of this section, ramps, transfer systems, steps, decks, and roofs are not considered elevated play components....
-
11B-240.2.2 Elevated play components
For purposes of this section, ramps, transfer systems, steps, decks, and roofs are not considered elevated play components....
-
11B-206.2.6 Performance areas
Performance areas, including but not limited to, stages, platforms and orchestra pits, are treated as raised or lowered areas within a given story and all are required to be accessible by ramp...
-
206.3 Location
Elements such as ramps, elevators, or other circulation devices, fare vending or other ticketing areas, and fare collection areas shall be placed to minimize the distance which wheelchair...
-
F240.2.2 Elevated Play Components
For purposes of this section, ramps, transfer systems, steps, decks, and roofs are not considered elevated play components....
-
240.2.2 Elevated Play Components
For purposes of this section, ramps, transfer systems, steps, decks, and roofs are not considered elevated play components....
-
Study Objectives
Highest and lowest heights for a two-step transfer with and without an integrated ramp 2....