The leading edge of such guardrail or barrier shall be located 27 inches (685 mm) maximum above the finish floor or ground....
Search Results "Ceramic Tile Flooring"
Commonly Searched Documents
-
307.4 Vertical Clearance
-
407.2.1.4 Location
A destination-oriented elevator system provides lobby controls enabling passengers to select floor stops, lobby indicators designating which elevator to use, and a car indicator designating...
-
407.2.1.4 Location
A destination-oriented elevator system provides lobby controls enabling passengers to select floor stops, lobby indicators designating which elevator to use, and a car indicator designating...
-
407.2.1.4 Location
A destination-oriented elevator system provides lobby controls enabling passengers to select floor stops, lobby indicators designating which elevator to use, and a car indicator designating...
-
9.5.1 New Construction
EXCEPTION: Where elevators are not provided as allowed in 4.1.3(5), accessible amenities are not required on inaccessible floors as long as one of each type is provided in common areas on...
-
9.4 POST OFFICE BOXES
Accessible post office boxes shall be located in the second or third set of modules from the floor, approximately 12 in to 36 in (305 mm to 915 mm) above the finished floor....
- SafePath Courtedge™ Reducer Ramps
-
604.8.1.4 Toe Clearance
The front partition and at least one side partition shall provide a toe clearance of 9 inches (230 mm) minimum above the finish floor and 6 inches (150 mm) deep minimum beyond the compartment-side...
-
604.7 Dispensers
The outlet of the dispenser shall be 15 inches (380 mm) minimum and 48 inches (1220 mm) maximum above the finish floor and shall not be located behind grab bars....
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
Technical Memorandum TM 2012-04 Multi-Story Buildings and Facilities
The term “story” is defined in 106.5.64 as that portion of a building or facility designed for human occupancy included between the upper surface of a floor or the upper surface of the floor...
-
604.8.1.4 Toe Clearance
The front partition and at least one side partition shall provide a toe clearance of 9 inches (230 mm) minimum above the finish floor and 6 inches (150 mm) deep minimum beyond the compartment-side...
-
404.2.3 Doorways - Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
404.2.3 Doorways - Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
10 - foot straightedge method
10 - foot straightedge method This is the classic method for determining the flatness of concrete and other types of finished floors....
-
11B-404.2.3 Clear width
There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
-
11B-404.2.3 Clear width
There shall be no projections into the required clear opening width lower than 34 inches (864 mm) above the finish floor or ground....
-
4. Desk with knee and toe space
Desk with knee and toe space and clear floor space for front approach....
-
Addition
An expansion, extension, or increase in the gross floor area or height of a building or facility....
-
5.3.2.2 Surface
The surface of the turning space and clear floor or ground space shall be firm and stable....
-
6b.
Is the change in level from the floor to the lift surface ramped or beveled? Yes _____ No _____...
-
TTYs: ADA Standard Section 217.4
Section 217.4 covers scoping requirements in the current ADA Standards for TTYs.
-
Height: ADA Standard Section 606.3
Section 606.3 covers the current ADA Standards for the height of lavatories and sinks.
-
11B-233.3.4.3 Alterations to residential dwelling units with adaptable features
Exception: Where any portion of a building’s exterior is preserved, but the interior of the building is removed, including all structural portions of floors and ceilings and a new building...