Please indicate the composition of the trail by selecting the material(s) installed: Natural/Native soil with stabilizer Natural/Native soil without stabilizer Soil with high organic...
Search Results "Actuation Indicator"
Commonly Searched Documents
-
16. Please indicate the composition of the trail by selecting the material(s) installed
-
34. Please indicate the condition of the trail’s surface characteristics within the last quarter
Please indicate the condition of the trail’s surface characteristics within the last quarter (choose all that apply): Trail’s Surface Characteristics Choose all that apply...
-
5. Please indicate the zip code in which your agency is geographically located (state)
Please indicate the zip code in which your agency is geographically located (state):...
-
32. Please indicate the condition of the trail’s surface characteristics over a period of time
Please indicate the condition of the trail’s surface characteristics over a period of time (choose all that apply): Trail’s Surface characteristics Monthly Quarterly...
-
23. Please indicate the aggregate type used and the depth at which it can be found
Please indicate the aggregate type used and the depth at which it can be found (choose all that apply): Aggregate Type Depth 0”- 4” Depth 5”- 8”...
-
13. Please indicate the average traffic per month on trail/visitor usage
Please indicate the average traffic per month on trail/visitor usage: <100 101<x<500 501<x<1000 1001<x<5000 5001<x<10000 >10001 Unknown N/A...
-
17. If a soil stabilizer was installed as part of the trail surface material, please indicate the product name.
If a soil stabilizer was installed as part of the trail surface material, please indicate the product name....
-
12. Please indicate your (the survey respondent) job title or position within your agency
Please indicate your (the survey respondent) job title or position within your agency....
-
31. Please indicate the number of the complete replacements of the trail surface that you have already performed
Please indicate the number of the complete replacements of the trail surface that you have already performed (in total, so far):...
-
21. Please indicate the typical slope the particular trail has prior to trail installation
Please indicate the typical slope the particular trail has prior to trail installation: Up to 5% Between 5% (1:20) and 8.33% (1:12) Between 8.33% (1:12) and 10% (1:10) Between 10%...
-
35. Please indicate any unusual events that occurred during the last quarter that affected the surface of the trail
Please indicate any unusual events that occurred during the last quarter that affected the surface of the trail (e.g., inclement weather conditions, major program use, special events, etc...
-
14. Please indicate the types of use permitted on this trail in addition to pedestrian/hiker (choose all that apply):
Please indicate the types of use permitted on this trail in addition to pedestrian/hiker (choose all that apply): Motorized recreation (i.e. motorcycle, snowmobile) Mountain bike Equestrian...
-
18. If a soil stabilizer was not used, please indicate the application method and material(s) used to achieve the natural surface
If a soil stabilizer was not used, please indicate the application method and material(s) used to achieve the natural surface....
-
33. Please indicate the number of maintenance activities that have been performed the last quarter, on the surface of the trail
Please indicate the number of maintenance activities that have been performed the last quarter, on the surface of the trail: Specific Maintenance Activity Quarterly...
-
19. Please indicate the duration of the warranty/guarantees offered for the surface product used by the sales representative/vendor
Please indicate the duration of the warranty/guarantees offered for the surface product used by the sales representative/vendor....
-
11B-404.3.5 Controls
Where push plates, vertical actuation bars or other similar operating devices are provided, they shall be placed in a conspicuous location....
-
E.6.ii. - Does the Federal government have a 'logo program' indicating which products meet 508 standards?
The Federal government does not currently have a Section 508 logo (such as the Energy Star) that attaches to a product to indicate that the product conforms to the Section 508 standards....
-
29. Please indicate what the length of time was between the installation of the trail surface material and the first necessary repair
Please indicate what the length of time was between the installation of the trail surface material and the first necessary repair: 1 month 3 months 6 months...
-
20. Please indicate the trail’s soil composition/type, and the depth at which it can be found
Please indicate the trail’s soil composition/type, and the depth at which it can be found (choose all that apply): Soil composition/ type Depth 0”- 4” Depth...
-
Rail Station Signs: ADA Standard Section 810.6
Signs shall not be required to comply with 810.6.1 and 810.6.2 where audible signs are remotely transmitted to hand-held receivers, or are user- or proximity-actuated....
- S.R. Smith Pool MultiLift Lift Video 3: Resolution
-
907.2.6.2.1 System initiation
Actuation of an automatic fire-extinguishing system, a manual fire alarm box or a fire detector shall initiate an approved fire alarm signal which automatically notifies staff....
-
AUTOMATIC DOOR
A door equipped with a power operated mechanism and controls that open and close the door automatically upon receipt of a momentary actuating signal....
-
AUTOMATIC DOOR
A door equipped with a power operated mechanism and controls that open and close the door automatically upon receipt of a momentary actuating signal....