Test No. 1 -- Individual Building Test may only be used if the site has terrain over 15 percent slope. Test No. 3 -- Unusual Characteristics Test may be used if applicable....
Search Results "Counter Slope"
-
1150A.1 General
-
11B-203 General exceptions
Specific employee work areas in health facilities include, but are not limited to: nurse sub-stations, operating room tables, counters in clinical laboratories, imaging equipment, control...
-
Roundabouts (Section-by-Section Analysis)
Analysis) A roundabout is a circular intersection with yield control at entry, which permits a vehicle on the circulatory roadway to proceed, and with deflection of the approaching vehicle counter-clockwise...
-
Executive Summary
In many instances, passengers who cannot use a kiosk due to a disability are simply directed to a line at the ticket counter where they receive expedited service from an agent....
-
“Priority” Seating Method
The carrier may provide this notice through its computer reservation system, verbal information provided by reservations personnel, counter signs, seat cards or notices, frequent-flyer literature...
-
11B-805.4.3 Turning space
Treatment room - Treatment rooms are required to provide a turning space, accessible handwashing fixture, accessible counter and writing surface, and 36-inch wide access along the full length...
-
11B-805.4.3 Turning space
Treatment room - Treatment rooms are required to provide a turning space, accessible handwashing fixture, accessible counter and writing surface, and 36-inch wide access along the full length...
-
Where do I measure for a handrail extension?
See Dimensions D in the attached Sketches B and C. 505.10.3 Bottom Extension at Stairs At the bottom of a stair flight, handrails shall extend at the slope of the stair flight for...
-
1003.3.2 Boarding Pier Clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp....
-
Data Collection Procedures
Potential causes for variation might be running and cross slope, a difference in drainage and/or adjacent runoff, and sun vs. shade location of reading locations....
-
Required Means of Egress [IBC §1007.1 (2003), §1003.2.13 (2000)]
The IBC (2003) permits one accessible means of egress from: wheelchair seating in assembly areas with sloped floors where the common path of travel meets aisle requirements for...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ...
- Envirobond Organic-Lock™ Surface Stabilizer
-
Study limitations
Another study researched the effect of cross-slopes on the mobility of manual wheelchair users and also reported the majority of their subjects having spinal cord injury followed by multiple...
-
Installation
Sites installed with EWF were found to have the highest SDS within the first year of installation including deficiencies with excessive running slope, cross slope and change in level. ...
-
Overview
original scope of work for this research project involved a longitudinal study that would examine the influence of five key variables: hydrology, climate, soil condition, grade and cross slope...
-
Accessibility - Flatness and Lippage
Concrete paving slabs: Laying pattern .. ..90 degree herringbone ..Stack bond or runningbond Slope in direction of travel All segmental concrete paving products...
- Garaventa Evacu-Trac CD7 Evacuation Chair
-
Swimming pools, wading pools, saunas, and steam rooms. (Section-by-Section Analysis)
Most commenters stated that installing a sloped entry in an existing wading pool is not likely to be feasible....
-
If Carrier Contends That Attendant Is Required for Safety Reasons and Passenger Disagrees
Example: A passenger with quadriplegia traveling alone approaches the check-in counter....
-
G. Completing the Survey and Checklist
The accessible route is a continuous unobstructed pedestrian path without steps or steep slopes that connects all accessible site and building features and spaces together....
-
Installation of Test Surfaces
All roots, stones, and vegetation were removed. 2) Place a diversion along the slope above the test area to assure no direct site drainage into the surfaced area. 3) Cover entire subgrade...
-
11B-1003.3.2 Boarding pier clearances
As the water level decreases, segments of the chain end up resting on the launch ramp surface, matching the slope of the launch ramp. ◼...