Similarly, one trade association representing venues estimated that the cost for a professional stenographer at a sporting event runs between $500 and $1,000 per game or event, the cost...
Search Results "Capital Construction Cost"
Commonly Searched Documents
-
Captioning at sporting venues. (Section-by-Section Analysis)
-
Captioning at sporting venues. (Section-by-Section Analysis)
Similarly, one trade association representing venues estimated that the cost for a professional stenographer at a sporting event runs between $500 and $1,000 per game or event, the cost...
-
‘‘Facility.’’
It includes both indoor and outdoor areas where human-constructed improvements, structures, equipment, or property have been added to the natural environment....
-
Sec. 12150. Interim accessibility requirements. [Section 230]
If final regulations have not been issued pursuant to section 12149 of this title, for new construction or alterations for which a valid and appropriate State or local building permit is...
-
12186(d)(1) Facilities
(1) Facilities If final regulations have not been issued pursuant to this section, for new construction or alterations for which a valid and appropriate State or local building permit...
-
12165(a) Stations
(a) Stations If final regulations have not been issued pursuant to section 12164 of this title, for new construction or alterations for which a valid and appropriate State or local building...
-
Facility (Section-by-Section Analysis)
It includes both indoor and outdoor areas where human-constructed improvements, structures, equipment, or property have been added to the natural environment....
-
Final Regulatory Flexibility Analysis
However, the Architectural Barriers Act also applies to facilities constructed or altered by non-federal entities on behalf of the United States....
-
Exception Based on Structural Impracticability in DOJ’s 2010 ADA Standards and DOT's ADA Regulations
Structural Impracticability in DOJ’s 2010 ADA Standards and DOT's ADA Regulations DOJ’s 2010 ADA Standards and DOT's ADA regulations specify that full compliance is not required in new construction...
-
Slope [§405.2] and Cross Slope [§405.3]
Specifying a running slope of 7.5% maximum and a cross slope of 1.5% maximum for exterior ramps will accommodate most irregularities or variances due to construction methods or materials...
-
68.52. Inspections
469.101 of the Act shall obtain an inspection from the department, a registered accessibility specialist, or a contract provider not later than the first anniversary of the completion of construction...
-
Alterations to Existing Facilities
Alterations to Existing Facilities The draft guidelines required alterations to existing facilities to comply with the requirements for new construction to the maximum extent feasible...
-
Soiltac Powder Mix-In
There was no constructed drainage mechanisms that would be considered appropriate in the trail construction industry for this surface, therefore the water runoff from the adjacent earth...
-
II. Statutory and Regulatory Background
As amended, Section 804(f)(3)(C) of the Act provides that unlawful discrimination includes a failure to design and construct covered multifamily dwellings for first occupancy after March...
-
(8) the City's policies and procedures
(8) the City's policies and procedures regarding new construction and alterations, which do not require a close-out inspection for compliance with federal disability access design standards...
-
Technical Memorandum TM 2012-09 Employee Break Rooms
2012 TAS Reference: 212 and 804 In accordance with TAS 106.5.28, kitchenettes and break rooms are not employee work areas; therefore, they must be accessible and must be designed and constructed...
-
1132A.4, Item 1
Exterior landings of impervious construction (e.g., concrete, brick, flagstone) serving primary entry doors and required exit doors are limited to not more than ½ inch (12.7 mm) of change...
-
§ 36.401(b)(1)
, but that portion used exclusively in the operation of the commercial facility or that portion used both for the commercial facility and for residential purposes is covered by the new construction...
-
Sec.36.401(b)(1)
, but that portion used exclusively in the operation of the commercial facility or that portion used both for the commercial facility and for residential purposes is covered by the new construction...
-
Trail Designed Use
Trail Designed Use—The managed use of a trail that requires the most demanding design, construction, and maintenance parameters and that, in conjunction with the applicable trail class,...
-
2.9.1 Natural Elements
However, safety regulations or Forest Service construction and maintenance standards may define clear space and limit the allowable extension of natural protruding objects over the ORAR...
-
1132A.4, Item 1
Exterior landings of impervious construction (e.g., concrete, brick, flagstone) serving primary entry doors and required exit doors are limited to not more than ½ inch (12.7 mm) of change...
-
Element-by-element safe harbor for public accommodations. (Section-by-Section Analysis)
These commenters argued that the financial cost and business disruption resulting from retrofitting elements constructed or previously modified to comply with 1991 Standards would be detrimental...
- Increasing Opportunities for Access on the Appalachian Trail: A Design Guide