They are adjusted for each project according to the factors below and appear in the possible solution pages for that project as adjusted....
Search Results "Project"
-
Cost Estimates for Barrier Removal
-
Dislife: More than a sign
Requires the Registered User plan or above. Login!
-
504.5 Nosings
Nosings that project beyond risers shall have the underside of the leading edge curved or beveled....
-
§8.22(b)
(b) Subject to paragraph (c) of this section, a minimum of five percent of the total dwelling units or at least one unit in a multifamily housing project, whichever is greater, shall be...
-
68.101(a) State Leased Buildings > $12,000
For state leased buildings or facilities that are being constructed, renovated, or modified, an Elimination of Architectural Barriers Project Registration form or Architectural Barriers...
-
Technical Memorandum TM 2012-05 Safe Harbor
TM 2012-05 Safe Harbor Effective Date: January 22, 2013 2012 TAS Reference: 106.5.57 The following clarifications are provided to address variances issued for projects constructed...
-
Military Installation
Military installation does not include any facility used primarily for civil works, rivers and harbors projects, or flood control projects. ...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
1.2.1
A California-registered structural engineer shall examine the project and prepare a written statement certifying that the project does not contain any work of a structural nature....
-
14.2 Q. If both open and covered parking spaces are provided, how many of each type must be accessible?
., surface parking or garage, that are provided for other residents of the project....
-
6.2 Additional Accessible Elements
6.2 Additional Accessible Elements: The obligation to upgrade the additional accessible elements in Item 6 applies only to those elements within the primary path of travel serving the project-specific...
-
11B-812.10.4 Location
EV chargers shall be adjacent to, and within the projected width of, the vehicle space being served. Exceptions: 1....
-
ADA Training
A project of the ADA National Network and sponsored by the Southeast ADA Center....
-
Floor or Ground Surfaces: ADA Standard Section 502.4
Section 502.4 covers the current ADA Standards for the floor or ground surfaces of accessible parking spaces.
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1½ inches (38 mm) minimum....
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
609.3 Spacing
The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum....
-
UNREASONABLE HARDSHIP
When the enforcing agency finds that compliance with the building standard would make the specific work of the project affected by the building standard infeasible, based on an overall evaluation...
-
Appendix C: Resources
Project UNIFY www.specialolympics.org/projectunify.aspx The Special Olympics' Project UNIFY is supported by the Office of Special Education Programs (OSEP)....
-
404.2.3 Clear Width
There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground....
-
11B-202 Existing buildings and facilities
of this code as those requirements or regulations now exist or are hereafter amended consisting of one or more of the following items shall be limited to the actual scope of work of the project...
