1008.3.1.4 Transfer Supports. At least one means of support for transferring shall be provided. Figure 1008.3.1 Transfer Platforms...
Search Results "Construction Support Facility"
-
1008.3.1.4 Transfer Supports
-
68.10(7) Construction Documents
(7) Construction Documents--Drawings, specifications, addenda, change orders, construction change directives and other supplemental documents prepared for the purpose of regulatory approval...
-
II-6.1000 General
All facilities designed, constructed, or altered by, on behalf of, or for the use of a public entity must be readily accessible and usable by individuals with disabilities, if the construction...
-
68.10(4) Commencement of Construction
(4) Commencement of Construction--The date of placement of engineering stakes, delivery of lumber or other construction materials to the job site, erection of batter boards, formwork, or...
-
M301.3 Transfer Supports
o Rationale: Discontinuous allows for the vertical support structure that is necessary for supporting the grip....
-
8. New Construction and Alterations
New Construction and Alterations Otherwise, as previously agreed, new construction and alterations within the meaning of 28 C.F.R. § 35.151 will not count toward the $31 million, including...
-
68.10(6) Completion of Construction
(6) Completion of Construction--The date when a construction project results in occupancy or the issuance of a certificate of occupancy....
-
NEW CONSTRUCTION AND ALTERATIONS {35.151}
NEW CONSTRUCTION AND ALTERATIONS {35.151} New Construction Shall be designed and constructed to be readily accessible to and usable by individuals with disabilities...
-
Public entrances
Sixty percent of all public entrances to the facility must be accessible. If there are only two entrances, both must be accessible. (DOT ADA Standard 206.4.1.)...
-
New Construction
Users of this guide must familiarize themselves with the specific scoping requirements that apply to each element, building, facility, or site that is subject to the Standards adopted to...
-
Subpart D -- New Construction and Alterations (Preamble, Section-by-Section Analysis)
new construction and alterations to be accessible....
-
Section 4.1.3, Accessible Buildings: New Construction (Preamble, Section-by-Section Analysis)
• Section 4.1.3, Accessible Buildings: New Construction This section establishes scoping requirements for new construction of buildings and facilities....
-
1008.3.1.4 Transfer Supports
At least one means of support for transferring shall be provided....
-
1008.3.1.4 Transfer Supports
At least one means of support for transferring shall be provided....
-
E208.1 General
Where an agency provides support documentation or services for ICT, such documentation and services shall conform to the requirements in Chapter 6....
-
E208.1 General
Where an agency provides support documentation or services for ICT, such documentation and services shall conform to the requirements in Chapter 6....
-
III-5.0000 NEW CONSTRUCTION
[See subsections ...]
-
Subpart D -- New Construction and Alterations (Section-By-Section Analysis and Response to Comments)
new construction and alterations to be accessible....
-
11B-1008.3.2.3 Transfer supports
At least one means of support for transferring shall be provided. [2010 ADAS] Advisory 1008.3.2.3 Transfer Supports. ...
-
11B-1008.3.2.3 Transfer supports
At least one means of support for transferring shall be provided. [2010 ADAS] Advisory 1008.3.2.3 Transfer Supports....
-
11B-1008.3.2.3 Transfer supports
At least one means of support for transferring shall be provided. Advisory 11B-1008.3.2.3 Transfer supports....
-
11B-407.4.10.3 Structural strength
Allowable stresses shall not be exceeded for materials used when a vertical or horizontal force of 250 pounds (1112 N) is applied at any point on the support rail, fastener, mounting device...
-
11B-407.4.10.3 Structural strength
Allowable stresses shall not be exceeded for materials used when a vertical or horizontal force of 250 pounds (1112 N) is applied at any point on the support rail, fastener, mounting device...
-
11B-407.4.10.1 Location
Clearance between support rails and adjacent surfaces shall be 1½ inches (38 mm) minimum....