two-step process: measurement of the slope of the undisturbed site between the planned entrance and all vehicular or pedestrian arrival points; and measurement of the slope of the planned finished...
Search Results "Finished Grade"
-
(1) Site impracticality
-
Section 2. Finished grade
"Finished grade" means the ground surface of the site after all construction, levelling, grading, and development has been completed....
-
§100.205(a)
(a) Covered multifamily dwellings for first occupancy after March 13, 1991 shall be designed and constructed to have at least one building entrance on an accessible route unless it...
-
1(2) Site impracticality
(2) Site impracticality. Covered multifamily dwellings with elevators shall be designed and constructed to provide at least one accessible entrance on an accessible route, regardless...
-
1(2)(a)(i) Individual building test
site measured between the planned entrance and all vehicular or pedestrian arrival points within 50 feet of the planned entrance exceed 10 percent; and (B) the slopes of the planned finished...
-
Site Impracticality Determinations
Other commenters stated that the slope criterion for the planned finished grade should not exceed 8.33%. The Congressional sponsors of the Act (U.S....
-
11.1 Q. Under the individual building test, how is the second step of the test performed, which involves measuring the slope of the finished grade between the entrance and applicable arrival points?
A. The slope is measured at ground level from the entrance to the top of the pavement of all vehicular and pedestrian arrival points within 50 feet of the planned entrance, or, if...
-
12.2 Q. What happens if a builder deliberately manipulates the grade so that a second story, which also might have been treated as a ground floor, requires steps?
Deliberate manipulation of the height of the finished floor level to avoid the requirements of the Fair Housing Act would serve as a basis for the Department to determine that there is reasonable...