|
VERIFY FRAMING – remember finish material thicknesses! |
||
|
Slope, width and headroom of all interior accessible routes. |
||
|
Door opening widths. |
||
|
Maneuvering clearances/landings at doors. |
||
|
Distance between doors in series. |
||
| Grab bar backing in toilet/shower rooms. | ||
| Backing for grab bars in bathtub/shower rooms. | 11B-610 | |
| Width and depth of shower stalls. | 11B-608.2 | |
| Drinking fountain alcoves/wing walls. | 11B-602.9 | |
| Tread dimensions on stairs including nosings. Verify finish materials for variances | 11B-504 | |
| Backing for handrails at ramps/stairs. | 11B-505 | |
| Elevator shaft dimensions. Check plans for Fire Assembly thickness | 11B-407.4 | |
| Location of controls for operable windows to meet reach range and operation | 11B-229 | |
| Restroom dimensions. | 11B-604.8 | |
User Comments/Questions
Add Comment/Question