What constitutes “overlays of additional material to the road surface” with respect to milling, specifically, when a roadway surface is milled and then overlaid at the same height (i.e.,...
Search Results "Milling"
-
Q2: Milling a Road Surface
-
When is resurfacing considered to be an alteration?
to add curb ramps if it involves work on a street or roadway spanning from one intersection to another, and includes overlays of additional material to the road surface, with or without milling...