The Volpe Center gathered data from local transportation departments and vendors on various detectable warning materials and estimated the costs of 8 square feet of the materials for a typical...
Search Results "Material Cost"
Commonly Searched Documents
-
Costs to Provide Detectable Warning Surfaces on Curb Ramps (Section-by-Section Analysis)
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ASTM
ASTM F 1292-04 Standard Specification for Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment (see 1008.2.6.2)....
-
Printed material
Auxiliary Aids and Services Printed material: e....
-
Costs Not Monetized in the Formal Analysis
difficulty in estimating those costs....
-
Costs Not Monetized in the Formal Analysis
difficulty in estimating those costs....
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
ADJUSTED CONSTRUCTION COST
[DSA-AC] All costs directly related to the construction of a project, including labor, material, equipment, services, utilities, contractor financing, contractor overhead and profit, and...
-
5. ADJUSTED CONSTRUCTION COST
ADJUSTED CONSTRUCTION COST...
-
ASTM: ADA Standard Section 105.2.3
Section 105.2.3 of the ADA Standards cover references to the American Society for Testing and Materials (ASTM) standards.
-
Cost Estimates for Barrier Removal
Basic Costs $0.00 Cost Estimate is expected to be zero. $1.00 Unit Cost Estimate is too dependent on existing conditions to set a generic estimate....
-
Summary of Costs and Benefits
We determined the final rule would not result in additional costs for camping facilities and picnic facilities....
-
Other Cost Issues
Other Cost Issues An employer may not claim undue hardship simply because the cost of an accommodation is high in relation to an employee's wage or salary....
-
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis)
Questions Posed in the NPRM Regarding Costs and Benefits of Complying With the 2010 Standards (Section-by-Section Analysis) In the NPRM, the Department requested comment on various cost...
-
Poured in Place Rubber
The surface cost for PIP ranged from $6.59/sq. ft. to $19.80/sq. ft. ...
-
4.2.7. Maintenance and Administrative Costs
The costs covered by the maintenance and administrative costs in the Final RA are discussed in Section 4.2.7. ...
-
3.8 Maintenance and Administrative Costs
The cost estimation also quantifies any additional maintenance and administrative costs associated with the rulemaking. ...
-
Adjusted Construction Cost
DEFINITION NOTES Adjusted Construction Cost New and explicit definition to provide specific costs included in the adjusted...
-
§ 37.43(e)(2)(iv)
(iv) Costs associated with relocating an inaccessible drinking fountain....
-
§ 37.43(e)(2)
(2) Costs that may be counted as expenditures required to provide an accessible path of travel include:...
- Stabilizer Solutions StaLok Material Waterless Natural Pavement
-
Use Zone
The ground level area beneath and immediately adjacent to a play structure or play equipment that is designated by ASTM F 1487 (incorporated by reference, see “Referenced Standards”...
-
Costs and Personnel Time for EWF Installation
No costs were incurred for edging since treated wood edging was already installed....
-
H) Accessible Print Material
Alternate formats may include materials in Braille, large print, files on computer disk that can be used in a personal computer, or an audiotape recording of the print document....