An official document or certificate issued by the building official that authorizes performance of a specified activity. Advisory Definition of PERMIT....
Search Results "Building Permit"
Commonly Searched Documents
-
PERMIT
- Accessible Pittsburgh: Visitability
-
Choice of Option One for Defining ‘‘Designed and Constructed for First Occupancy’’ (Preamble, Section-by-Section Analysis)
would be considered to be ‘‘for first occupancy’’ after January 26, 1993, only (1) if the last application for a building permit or permit extension for the facility is certified to be...
-
Choice of Option One for Defining "Designed and Constructed for First Occupancy'' (Section-By-Section Analysis and Response to Comments)
would be considered to be "for first occupancy'' after January 26, 1993, only (1) if the last application for a building permit or permit extension for the facility is certified to be complete...
-
PERMIT
An official document or certificate issued by the building official that authorizes performance of a specified activity. Advisory Definition of PERMIT....
-
[A] PERMIT
[A] PERMIT. An official document or certificate issued by the authority having jurisdiction which authorizes performance of a specified activity. Advisory Definition of PERMIT. ...
-
[A] PERMIT
Advisory Definition of PERMIT. In State-funded construction, a letter following plan review which approves the plans and allows the release of funds is equivalent to a "permit.”◼...
-
Sec.36.401(a)(2)(i)
(i) If the last application for a building permit or permit extension for the facility is certified to be complete, by a State, County, or local government after January 26, 1992 (or, in...
-
§ 36.401(a)(2)(i)
(i) If the last application for a building permit or permit extension for the facility is certified to be complete, by a State, County, or local government after January 26, 1992 (or, in...
-
13.13 Permitted Transfer
13.13 “Permitted Transfer” means one of the following:...
-
Designed and Constructed for First Occupancy (Preamble, Section-by-Section Analysis)
Designed and Constructed for First Occupancy According to paragraph (a)(2), a facility is subject to the new construction requirements only if a completed application for a building permit...
-
Designed and Constructed for First Occupancy (Section-By-Section Analysis and Response to Comments)
Section-By-Section Analysis and Response to Comments) According to paragraph (a)(2), a facility is subject to the new construction requirements only if a completed application for a building...
-
8.1 Q. The Fair Housing Act applies to covered multifamily dwellings built for first occupancy after March 13, 1991. What is acceptable evidence of first occupancy?
The determination of first occupancy is made on a building by building basis....
-
Building Requirement: ADA Standard Section 217.4.3
Section 217.4.3 covers scoping requirements in the current ADA Standards for TTYs on the floor of public and private buildings.
-
§ 36.401(a)(2)
(2) For purposes of this section, a facility is designed and constructed for first occupancy after January 26, 1993, only –
-
Sec.36.401(a)(2)
(2) For purposes of this section, a facility is designed and constructed for first occupancy after January 26, 1993, only --
-
Application Based on Building or Facility Use: ADA Standard Section 201.2
Section 201.2 covers the application of the most current requirements based on the building or facility use.
-
Public Buildings: ADA Standard Section 217.4.2.1
Section 217.4.2.1 covers scoping requirements in the current ADA Standards for TTYs on the floor of a public building.
-
BUILDING
Advisory Definition of BUILDING. The accessibility standards generally apply to buildings and facilities....
-
First Occupancy
The standard, "first occupancy," is based on actual occupancy of the covered multifamily dwelling, or on issuance of the last building permit, or building permit renewal, on or before January...
-
Building
Any structure used or intended for supporting or sheltering any use or occupancy.
-
Compliance Determinations by State and Local Jurisdictions
permit applicant with a sense of finality that proposed design plans are in compliance with the Act....
-
3. If I comply with the California accessibility requirements, am I in compliance with ADA?
Remember that the accessibility requirements are reviewed by the building department only when a project is submitted for permit (meaning when you design, construct, alter, remodel, add,...
-
Public Building or Facility
A building or facility or portion of a building or facility designed, constructed, or altered by, on behalf of, or for the use of a public entity subject to title II of the ADA and 28 CFR...