Electric Vehicle Charging Stations, Accessibility: FAQs

Note: This document or portion of document references a state or local code that is stricter than the 2010 ADA Standards requires.

If a property owner hits the 20% cost cap on path of travel improvements when installing charging stations, are there any other accessibility site retrofits that would still be required?

RESPONSE: EVCS required to be accessible by CBC Chapter 11B must have both, an accessible route to the facility entrance (see CBC Section 11B-812.5.1) and an accessible route from the vehicle space to the EVSE (see CBC Section 11B-812.5.2). No exceptions are provided but you can use existing accessible routes to help satisfy these requirements. These requirements are separate from, and are not limited by the 20% cost cap on path of travel improvements.

When a property owner hits the 20% cost limitation on path of travel improvements, the jurisdictional entity cannot require further improvements to the path of travel to occur. The property owner should be advised, however, that for older facilities that pre-date the ADA, barrier removal is required by the ADA. Barrier removal, however, will not be enforced by the local jurisdictional entity.

[MORE INFO...]

*You must sign in to view [MORE INFO...]