DSA IR 11B-10: SCOPING AND PATH OF TRAVEL UPGRADE REQUIREMENTS FOR FACILITY ALTERATION, ADDITION AND STRUCTURAL REPAIR PROJECTS (with revisions issued through April 2017)
6.2 Additional Accessible Elements: The obligation to upgrade the additional accessible elements in Item 6 applies only to those elements within the primary path of travel serving the project-specific area of alteration. Typically, Item 6 will come into play only when all of the elements in the preceding items either 1) are in compliance with the requirements, 2) have been included in the project’s path of travel upgrades scope of work or 3) are discretionary items, such as public telephones, and not present as existing elements.