Hello. Please sign in!

DSA IR 11B-10: SCOPING AND PATH OF TRAVEL UPGRADE REQUIREMENTS FOR FACILITY ALTERATION, ADDITION AND STRUCTURAL REPAIR PROJECTS (with revisions issued through April 2017)

2.2 Path of Travel Exterior Elements: In addition to the five specific items listed above, the path of travel also includes an exterior approach to the project area. This requirement must be evaluated on a project- and site-specific basis and could include parking, site arrival points, bus loading zones and the accessible route connecting them with the primary entrance to the project’s area of work.

[MORE INFO...]

*You must sign in to view [MORE INFO...]