BEGIN:VCALENDAR
VERSION:2.0
PRODID:icalendar-ruby
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20260417T023801Z
UID:226ee177-0533-4ea1-8683-6f3480d7c1c2
DTSTART:20170809T230000
DTEND:20170810T060000
DESCRIPTION:\nDate/Time: August 9\, 2017 from 9:00 a.m. - 4:00 p.m.\n\nLoc
 ation: DSA San Diego Regional Office\, San Diego\, CA.\n\nDescription: 
 This one-day course provides a framework around the DSA plan review proces
 s for accessibility compliance and equips participants with the essential 
 concepts\, reference materials and job aides for conducting timely\, consi
 stent\, and accurate plan reviews. Throughout the course\, participants ha
 ve the opportunity to apply access code regulations to case studies and ex
 ercises. The course emphasizes procedures throughout the plan review proce
 ss as a means to set expectations for anyone involved in plan review or de
 velopment to ensure access compliance in the built environment.\n\nTopics:
 \n\n\n	\n	Application of scoping versus technical code sections.\n	\n	\n	D
 ifference between accessible route\, path of travel and circulation path.\
 n	\n	\n	Requirements for new construction\, additions and alterations.\n	\
 n	\n	Review of typical errors or omissions.\n	\n	\n	Reference materials pr
 ovided by the Division of the State Architect\n	\n\n\nLearning Objectives:
 \n\n\n	\n	Understand the enforcement authority for the 2013 California Bui
 lding Code\n	\n	\n	Understand how to analyze and apply the 2013 California
  Building Code provisions during the plan review process.\n	\n	\n	Compare 
 and contrast requirements of the California Building Code with other appli
 cable government regulations\, resulting in an increased awareness of disa
 bility access rights law.\n	\n	\n	Review construction documents for access
  compliance using the latest version of the California Code of Regulations
 \, Title 24\, Part 2\, Volume 1\, Chapter 11B.\n	\n\n\nRecommended For:\n\
 n\n	\n	Design Professionals\n	\n	\n	Local Building Officials\n	\n	\n	Proje
 ct Inspectors\n	\n	\n	Facility Managers\n	\n	\n	Building Contractors\n	\n	
 \n	Other Interested Parties\n	\n\n\nClass Includes:\n\n\n	\n	2016 DSA Advi
 sory Manual\n	\n	\n	Visual aids and other class-related materials may also
  be utilized\n	\n	\n	Food and drink is not included.\n	\n\n\nContinuing Ed
 ucation:\n\n\n	\n	5 AIA / CES Learning Units / HSW Credits\n	\n	\n	5 CASp 
 Continuing Education Units\n	\n	\n	3 ACIA Continuing Education Units\n	\n	
 \n	.5 ICC Continuing Education Units\n	\n\n\nNote: To receive Continuing 
 Education Units\, you are required to attend the entire class.\n\n
SUMMARY:DSA Academy Plan Review - Accessibility - San Diego\, CA - August 2
 017
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P7D
SUMMARY:Alarm notification
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P1D
SUMMARY:Alarm notification
END:VALARM
BEGIN:VALARM
ACTION:AUDIO
TRIGGER:-PT15M
ATTACH:Basso
END:VALARM
END:VEVENT
END:VCALENDAR
