BEGIN:VCALENDAR
VERSION:2.0
PRODID:icalendar-ruby
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20260417T010624Z
UID:b468e6e4-3c7b-44af-ad71-615fd499ef41
DTSTART:20170412T120000
DTEND:20170412T190000
DESCRIPTION:Date/Time: April 12\, 2017 from 9:00 a.m. - 4:00 p.m.\n\nLocat
 ion: DSA San Diego Regional Office\, San Diego\, CA.\n\nDescription: Th
 is one-day course provides a framework around the DSA plan review process 
 for accessibility compliance and equips participants with the essential co
 ncepts\, reference materials and job aides for conducting timely\, consist
 ent\, and accurate plan reviews. Throughout the course\, participants have
  the opportunity to apply access code regulations to case studies and exer
 cises. The course emphasizes procedures throughout the plan review process
  as a means to set expectations for anyone involved in plan review or deve
 lopment to ensure access compliance in the built environment.\n\nTopics:\n
 \n\n	\n	Application of scoping versus technical code sections.\n	\n	\n	Dif
 ference between accessible route\, path of travel and circulation path.\n	
 \n	\n	Requirements for new construction\, additions and alterations.\n	\n	
 \n	Review of typical errors or omissions.\n	\n	\n	Reference materials prov
 ided by the Division of the State Architect\n	\n\n\nLearning Objectives:\n
 \n\n	\n	Understand the enforcement authority for the 2013 California Build
 ing Code\n	\n	\n	Understand how to analyze and apply the 2013 California B
 uilding Code provisions during the plan review process.\n	\n	\n	Compare an
 d contrast requirements of the California Building Code with other applica
 ble government regulations\, resulting in an increased awareness of disabi
 lity access rights law.\n	\n	\n	Review construction documents for access c
 ompliance using the latest version of the California Code of Regulations\,
  Title 24\, Part 2\, Volume 1\, Chapter 11B.\n	\n\n\nRecommended For:\n\n\
 n	\n	Design Professionals\n	\n	\n	Local Building Officials\n	\n	\n	Project
  Inspectors\n	\n	\n	Facility Managers\n	\n	\n	Building Contractors\n	\n	\n
 	Other Interested Parties\n	\n\n\nClass Includes:\n\n\n	\n	2016 DSA Adviso
 ry Manual\n	\n	\n	Visual aids and other class-related materials may also b
 e utilized\n	\n	\n	Food and drink is not included.\n	\n\n\nContinuing Educ
 ation:\n\n\n	\n	5 AIA / CES Learning Units / HSW Credits\n	\n	\n	5 CASp Co
 ntinuing Education Units\n	\n	\n	3 ACIA Continuing Education Units\n	\n	\n
 	.5 ICC Continuing Education Units\n	\n\n\nNote: To receive Continuing Edu
 cation Units\, you are required to attend the entire class.\n
SUMMARY:DSA Academy Plan Review - Accessibility - San Diego\, CA - April 20
 17
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P7D
SUMMARY:Alarm notification
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
TRIGGER:-P1D
SUMMARY:Alarm notification
END:VALARM
BEGIN:VALARM
ACTION:AUDIO
TRIGGER:-PT15M
ATTACH:Basso
END:VALARM
END:VEVENT
END:VCALENDAR
